See more photos of this layout in our photo gallery.

Filmore Division of the Southern Railway System

Richard Gandy

Tour Schedule

Saturday November 07, 2009 1:00 pm - 5:00 pm

Directions

See It On The Map

From Intersection of Hwy 74 and Hwy 54 in Peachtree City
Take Hwy 54 west approx 1-1/2 miles to traffic light where Hwy 54 splits with Hwy 34 to Newnan
Take Hwy 54 South (Left) toward Sharpsburg
Go Approx 1-1/2 miles to Leesburg Plantation Subdivision on the left
Turn left onto Leesburg Plantation Drive , go to stop sign , turn right onto Jackson's Valley
Go to the second street on the left -turn left and it is the first house on the left

Layout at a Glance

Scale N
Size 32 x 15 plus 8 x 28
Prototype Southern Midland (Fictitious)
Locale mid eastern Atlantic coast
Era 1956
Layout Style Point to Point w/provisions for loop running
Len. Mainline 310'
Layout Height 42"
Benchwork L girder
Roadbed Cork on plywood
Trackwork code 80
Turnout Min. #6
Min. Radius 30"
Maximum Grade 1-1/2%
Scenery 65% complete
Backdrop painted drywall sky & clouds
Controls DCC

Updated: Sun Dec 6 11:13:34 2009

^ Top